Science

NASA Prepares for Artemis IV Mission

Updated 2026-07-23 15:40 UTC 1 source Neutral

Crews at NASA’s Michoud Assembly Facility in New Orleans are moving the 130-foot-tall liquid hydrogen tank for the Artemis IV mission. The tank will be tested separately from the main factory building.

Coverage timeline — 1 article
NASA
Crews at NASA’s Michoud Assembly Facility in New Orleans transport the 130-foot-tall Artemis IV liquid hydrogen tank out of a production cell inside the main factory building into a detached test building on a separate portion of the 829-acre site on May 15, 2026. The liquid hydrogen tank will form
2026-07-23 15:20 UTC
Share: Twitter / X LinkedIn